This month we were able to get most of the exterior studs up on 1st floor and start the exterior sheathing. We also worked on the roof framing and got the sheathing done on the North side and started to install the air and vapor barrier. We also got a lot of the interior walls framed on 1st floor and started some of the mechanical rough ins. The 2nd floor is also taking shape. We got all of the roof decking installed.