We got a good portion of the gym painted, installed the window on the East end of the gym, and started hanging light fixtures. We also installed the wood and the mantels on both fireplaces. We worked on installing light fixtures and installing interior windows. We finished and turned over the 2nd area of remodeling inside the existing building. We worked on remodeling the 3rd portion of the existing building and also worked on installing the longboard siding on the exterior of the gym. This week we finished painting the gym ceiling and got all the lights hanging and lit up. We finished the wood on the fireplace on the 2nd floor and also worked on installing lockers and casework. We continued the remodel of the 3rd phase of the existing building.

 